Roof replacement in Cicero
New Roof in Cicero: Get the Tear-Off Written Into the Contract

In Cicero the town's permit list leaves a lot to your contract. Tell us about your roof, book a roofer's visit, and hold the written estimate to the list below.
Booking is your choice after you see the price.
What we do
Describe the roof in a few lines, and an independent roofing contractor comes out to look at it, then prices the work for you in writing.
What we promise while you decide
- No charge from us, whether you book or not.
- The roofer's price comes to you on paper first.
- You may ask for a repair price beside the replacement one.
- Credit terms are spelled out on our Terms page.
Workmanship and contract terms belong to the roofer you hire.
Signed Roof Replacement Syracuse, (315) 640-3590
Read the full termsQuestions
Before you agree to roof replacement in Cicero
Can a Cicero roofer put new shingles over my old ones?
Only where the existing roof has a single layer and is sound. State code bars a recover over two or more layers or over a water-soaked roof. Ask the roofer to count the layers and say which one yours is.
The town does not need a permit. Does that mean the state rules do not apply?
No. The permit list is about town paperwork. The code on tear-off to the deck, ice barrier and drip edge is statewide, so put those items in the contract.
How do I compare two Cicero quotes?
Line them up on tear-off, deck sheets, eave barrier and drip edge, who pulls any permit, and the workers' compensation coverage. A lower quote that leaves out the tear-off is a different job.
Should I be home when the roofer comes?
Being there lets you point out where the ceiling stains. The roofer looks at the roof from outside and writes an estimate for the work they would do.
What Cicero's no-permit list means for your reroof
Cicero is a town, and its zoning page says roof installation or replacement needs no building permit when the job covers no more than two layers. That is the town's rule about paperwork. It says nothing about the roof you want, so your contract has to hold what a permit file might otherwise hold.
Ask the proposal to say who removes the old covering, how far down the removal goes and what happens when the deck turns out to be bad. The state rule is separate and applies in Cicero too. The town's two-layer wording is no leave to cover two layers.

A replacement removes the old roof to the deck, and a new layer is not allowed over two or more layers or over a water-soaked roof. If you are unsure whether your job fits the town's list, the zoning and planning page advises confirming with your contractor, so ask for that answer in writing.

Line by line
Two estimates, line by line
Tear-off to the deck
Bad deck wood
Ice barrier
Drip edge
Worn flashing
Permit
Workers' comp
Written contract
Cancel notice
A Cicero house from around 1980 and the roof it may have by now
The median Cicero home was built around 1980 by Census estimates, and about half the town's housing is older than that. Read that as a proxy. A house from around 1980 may well have had a first reroof by now, and housing of that age may still carry a second layer. It does not tell you what is on your roof.
Most Cicero homes are detached, so the decision is yours. You can learn a lot from the ground. Look at the shingle edge for stacked layers, and write down the year of the last reroof if you know it. When two quotes differ by a large amount, the first thing to compare is whether one of them removes the old layers and the other does not.
Deck sheets, eave and contract: lines a Cicero estimate should carry
Ask for these lines in writing. Tear-off to the deck. A price per sheet for any deck boards that need replacing. An ice barrier from the eave edge well past the outside wall. A drip edge at the eaves. These are the parts of a roof that decide whether it fails at the overhang, which is where Syracuse roofs usually end.
Then check the roofer. New York issues no state roofing license and the county runs no program of its own, so use what is public: the state's workers' compensation coverage search, a written contract, and the three business days you have to cancel a home improvement contract.
The contract must also say a deposit goes into escrow or is backed by a bond. If a roofer will not put these in writing, that tells you what you need to know.
Tell-tales
What a Cicero homeowner sees that points to roof replacement
| What you see | What it may point to |
|---|---|
| The estimate says re-cover | A price that skips the tear-off is for a new layer on the old ones. State code bars that over two or more layers or a soaked roof, so ask which one yours is. |
| Shingles on top of shingles | If a second layer is already on, the next roof comes off to the deck. Count layers at the roof edge before anyone prices it. |
| Stains only in a thaw | That points at the eave. Ask whether an ice barrier is in the price before you agree to a whole new roof for a field that may be fine. |
| Soft or dark boards the roofer finds | Deck boards that are dark, soft or sagging are a deck question. Ask how replacing them is priced per sheet. |
Other jobs
Other jobs for the same Cicero roof
Roof Repair
A section repair, priced before a replacement
Storm Damage Roofing
What the storm did, before you buy more roof
Ice Dam Roofing
The eave detail that decides an ice dam job
Nearby
Roof replacement in the next places over from Cicero
Get your Cicero tear-off priced in writing.